“We help bring personality and identity to your space. ”

TDK Commercial Fit Out is one on the industry’s principal contractors with an extensive portfolio. Working nationwide in all sectors of the construction industry, we specialize in design and build, refurbishment, maintenance and fit out projects.

From the initial concept to completion our attention to detail, tried and tested project management methods ensure the best service and finished product.

The relationship we develop and nurture with our clients is our core value. We have developed long term relationships with a broad range of Clients by achieving project deadlines, driving innovative construction solutions, demonstrating best value and ensuring our high standards of workmanship are never compromised.

Regardless of your project location, size or complexity, we offer a comprehensive tailored service that will exceed your expectations.

Case Study: Topshop/Topman Trafford Centre

Location: Manchester

Project duration: 28 Weeks

Project Value: £3.5 Million

A complete strip out and re-fit of a 63,000sq.ft. retail space to include several different brands Topshop, Topman, and Miss Selfridges across 2 floors. The project was phased to ensure continuous trading throughout the projects duration. The scope included oversized escalators, a spectacular bespoke helical staircase, and a large central feature frame on the first floor. The entire concept was designed to maximize the height and floor area available. The design is unique to the UK and the Arcadia Group.


Case Study: Topshop/Topman 214 Oxford Street

Location: Oxford Street

Project duration: 22 Weeks

Project Value: £900K

TDK have been working with the Arcadia Group for over 20 years. Oxford street 214 and 216 stores are 110,000 Ft² and are flagship to Arcadia. Working together we have completed numerous projects in the busy live environment, co-ordinating our works not to disturb the public during opening hours. We delivered, Topshop, Topman, beauty, shoes, and lingerie spaces. The project involved window seasonal displays, floor moves and staircase refurbishment.

TDK continue to work in partnership with Arcadia with all their leading high street brands.


Case Study: Topshop/Topman Stratford

Location: Stratford

Project duration: 22 weeks

Project Value: £1.8Million

Complete fit out project.


Case Study: Lalique, London

Location: Mayfair

Project duration: 4 Weeks

Project Value: £400k

A new luxury fit out to this prestigious boutique store, where design and display elements are prevalent throughout. This included secure cabinetry and display stands to showcase merchandise.


Case Study: Bosideng, South Molton Street

Location: Mayfair

Project duration: 7 Weeks

Project Value: £2Million

TDK was approached by Bosideng to create the brands’ first UK showroom. TDK created a peerless and stunning high end retail environment. New to the brand, yet grasping a full understanding of the Bosideng brand identity, our team planned, executed and delivered on time a masterpiece of retail shop fitting.


Case Study: Finlay Co London

Location: Soho

Project duration: 4 Weeks

Project Value: £300k

A full internal refit of the new London store for Finlay & Co, a high end sunglasses retailer, including new M&E services, new internal floor finishes, decorations and bespoke joinery.


Case Study: Department Store

Location: Brixton

Project duration: 22 months

Project Value: £16.8 Million

The development of a dilapidated Edwardian department store to create an office of 4,767sqm. Incorporating a design studio, a new social rooftop space designed as a series of pavilions, staff cafe, gallery seminar space, facilities for staff including cycle storage, showers and a landscaped garden courtyard. The development also included a refurbishment of the former fire Station and Stables adjoining the main building, converting these into Brixton Post office and three units for business.


Case Study: Ivy Park

Location: Wembley

Project duration: 3 Weeks

Project Value: £180k

A compete Internal refit Ivy Park head office including new WCs, alterations to audio visual and air conditioning systems, new floor finishes and management of installation of fixtures and fittings.


Case Study: Colmore Row

Location: Birmingham

Project duration: 13 Weeks

Project Value: £1 Million

This project involved various shell and core works and an internal fit out of the reception, meeting rooms and offices. The project was completed to a very high standard and to a tight program.


Case Study: 30 King Street

Location: King Street, London

Project duration: 9 weeks

Project Value: £230 K

Refurbishment to create a luxurious reception. The project involved specialist decoration, new floor finishes, innovative lights and bespoke joinery work.


Case Study: Central Square

Location: Newcastle

Project duration: 12 weeks

Project Value: £670 K

Refurbishment of the reception, office space and conversion of a café into an office. The project involved new mechanical and electrical works along with decoration, flooring and joinery work. TDK is involved in removal of out dated glass structure at the entrance and to install a new glass structure.


Case Study: Bolton University

Location: Bolton

Project duration: 7 Weeks

Project Value: £ 1.7 Million

This project for Bolton University involved the internal alteration, refit and complete redecoration of a former office block to create a new student center, with lecture rooms, seminar rooms, multi- functional spaces, communal spaces and reception. The work focused on delivering the project to a commercial budget.


Case Study: Stellar Group

Location: Mayfair, London

Project duration: 12 Weeks

Project Value: £480K

Refurbishment of an existing office space to create an exclusive office space with a welcoming reception, contemporary general work space, luxurious executive offices, boardroom and a kitchen space. The project involved in providing new AV and electrical system, new ceiling and flooring and complete new built bespoke in joinery.


Case Study: United Clothing

Location: London

Project duration: 12 Weeks

Project Value: £250k

Design and build of an existing office space in to a creative fashion studio for United Clothing.


Case Study: Champneys, Eastwell Manor

Location: Kent

Project duration: 10 Weeks

Project Value: £2 Million

Rejuvenation of spa facilities including reception, lounges, dining rooms, treatment rooms, gym, pool; incorporating new M&E systems, air conditioning, and audio visual systems. TDK worked closely with the client, to find alternative methods to meet their budget requirements.


Case Study: Wembley Stadium Corporate Box

Location: Wembley

Project duration: 2 Weeks

Project Value: £175K

Working closely with Intevari and Envir & Cult, this project was taken from brief, through manufacture to delivery in 2 weeks. The project involved new wall paneling, graphics, floor finishes, furniture and accessories.


Case Study: Notting Hill Prep School

Location: Lancaster Road, London

Project duration: 22 weeks

Project Value: £750 K

Full internal refurbishment of the school including M& E, new partition wall, flooring, decoration, joinery including, lighting and installation of acoustic floors, walls and ceilings.


Case Study: Regent College

Location: Great Titchfield Street, London

Project duration: 14 weeks

Project Value: £440 K

Refurbishment of an educational establishment to create an elegant reception, administrative work spaces, classrooms, student interaction spaces, games room and services. The project involved complete decoration, flooring and joinery work. Also new AV systems, electrical and lighting work were installed.


Case Study: House of Ho

Location: Fitzrovia

Project duration: 10 Weeks

Project Value: £ 900k

This project involved the refurbishment of a five floor listed building for the restaurant, retaining and restoring all existing features. The works included complete new M&E and interior fit out to meet the premium finishes, including marble floors throughout the ground floor, timber and carpet floor finishes. Bespoke joinery for marble tables, leather seating, reeded glass back bars on two floors and numerous credenzas, waiter stations and wine racks on all floors.